614 Exteriors does not offer the James Hardie ARTISAN® COLLECTION and HARDIE® BACKER BOARD at this time.
Step 1: Removal and complete tear-off of existing Siding, fanfold, and moisture barrier (if present)
Step 2: Inspection of Sheathing to check for any rotten wood (Replace if needed)
Step 3: Installation of Rigid Foam (Extruded Polystyrene Fanfold Underlayment Foam Insulation 1/4") to even walls so siding lays flat and to provide insulation for home.
Step 4: Installation of a moisture barrier, this will prevent water from entering the insulation and sheathing preventing any mold or rotted sheathing.
Step 5: Installation of channels around the trim of the home, this will be used to lock in the vinyl siding sections
Step 6: Installation of Accessory Blocks (Water spigot, electrical exterior light, etc.)
Step 7: Installation of starter strip, We follow the sheathing of the house and subtract ¼” and make a caulk line to ensure the starter is perfectly flat and all sections above are even.
Step 8: Installation of preferred Vinyl sections starting from the bottom of the wall
Step 9: Caulk all areas that are needed, such as windows and door trim.
Step 10: Final inspection of Vinyl Siding installation to make sure all of the steps were properly followed and the siding will last as intended.
Step 1: Remove any imperfections from the surface (usually power washed) such as chipping or cracking paint
Step 2: Inspection the trim boards to ensure they are in good shape
Step 3: Replacement of any rotten or bad trim boards
Step 4: Paint all surfaces requested
Step 5: Final inspection to make sure all areas that needed paint, paint was applied.